From initial site survey to ongoing support, we handle every stage of your EV charging project.
No hand-offs between contractors. No gaps in communication. One team, total delivery.
// Our Proven Methodology
From Survey to
Support.
Every project follows the same rigorous methodology. Transparent timelines, clear deliverables,
and dedicated support at every stage.
Step 01
Site Survey & Feasibility
We assess your electrical capacity, parking layout and operational needs to establish what's possible and what's practical.
- Electrical infrastructure evaluation
- Parking layout & space analysis
- Operational requirements assessment
- Feasibility report & recommendations
Typical Duration: 1-2 Weeks
Step 02
Design Proposal
You receive a clear, costed proposal — hardware options, site layout drawings and a recommended commercial model. No obligation.
- Custom site layout drawings
- Hardware specification & options
- Detailed cost breakdown
- Commercial model recommendations
Typical Duration: 1-2 Weeks
Step 03
DNO & Grid Connection
We manage all Distribution Network Operator applications, approvals and any required grid upgrades. This is often the longest lead-time item.
- DNO application preparation
- Grid connection assessment
- Upgrade coordination (if needed)
- Regulatory compliance management
Typical Duration: 4-12 Weeks
Step 04
Installation
Accredited engineers install all cabling, groundworks and charging hardware to the highest industry standards, with minimal disruption to your operations.
- Professional cabling & groundworks
- Hardware installation & integration
- Safety testing & certification
- Minimal operational disruption
Typical Duration: 2-4 Weeks
Step 05
Commissioning
Every charger is tested, activated and handed over with full documentation. Your team is trained before we leave site.
- Full system testing & validation
- Charger activation & configuration
- Staff training & documentation
- Handover & sign-off
Typical Duration: 1 Weeks
Step 06
Ongoing Support
From software and billing management to maintenance and performance monitoring — we're here for the long term.
- 24/7 technical support
- Software & billing management
- Preventive maintenance program
- Performance analytics & reporting
Typical Duration: Omgoiing
// Our Proven Methodology
Typical Project
Duration.
Most projects take 4–6 months from initial survey to go-live. The DNO grid connection process is typically
the longest lead-time item, which is why we start it early.