From initial site survey to ongoing support, we handle every stage of your EV charging project.
No hand-offs between contractors. No gaps in communication. One team, total delivery.

// Our Proven Methodology

From Survey to
Support.

Every project follows the same rigorous methodology. Transparent timelines, clear deliverables,
and dedicated support at every stage.

Step 01

Site Survey & Feasibility

We assess your electrical capacity, parking layout and operational needs to establish what's possible and what's practical.

  • Electrical infrastructure evaluation
  • Parking layout & space analysis
  • Operational requirements assessment
  • Feasibility report & recommendations

Typical Duration: 1-2 Weeks

Step 02

Design Proposal

You receive a clear, costed proposal — hardware options, site layout drawings and a recommended commercial model. No obligation.

  • Custom site layout drawings
  • Hardware specification & options
  • Detailed cost breakdown
  • Commercial model recommendations

Typical Duration: 1-2 Weeks

Step 03

DNO & Grid Connection

We manage all Distribution Network Operator applications, approvals and any required grid upgrades. This is often the longest lead-time item.

  • DNO application preparation
  • Grid connection assessment
  • Upgrade coordination (if needed)
  • Regulatory compliance management

Typical Duration: 4-12 Weeks

Step 04

Installation

Accredited engineers install all cabling, groundworks and charging hardware to the highest industry standards, with minimal disruption to your operations.

  • Professional cabling & groundworks
  • Hardware installation & integration
  • Safety testing & certification
  • Minimal operational disruption

Typical Duration: 2-4 Weeks

Step 05

Commissioning

Every charger is tested, activated and handed over with full documentation. Your team is trained before we leave site.

  • Full system testing & validation
  • Charger activation & configuration
  • Staff training & documentation
  • Handover & sign-off

Typical Duration: 1 Weeks

Step 06

Ongoing Support

From software and billing management to maintenance and performance monitoring — we're here for the long term.

  • 24/7 technical support
  • Software & billing management
  • Preventive maintenance program
  • Performance analytics & reporting

Typical Duration: Omgoiing

// Our Proven Methodology

Typical Project
Duration.

Most projects take 4–6 months from initial survey to go-live. The DNO grid connection process is typically
the longest lead-time item, which is why we start it early.